YVW – E14 Mt Aitken to Mt Ridley Water Project

EPS1

Project Scope

The project included the construction of a Potable Water Pump Station at the existing Mt Aitken Tank Site in Craigieburn for Yarra Valley Water.

Works included:

  • Bulk excavation for underground pump station pump room;
  • Cast-Insitu construction of pump station pump room, loading bay slab, switchroom slab and roof slab;
  • Structural steel framework for above ground pump station;
  • Fabrication and installation of precast wall panels;
  • Mechanical and electrical fabrication, installation and commissioning, including all site conduit installation;
  • DN825 and DN900 welded MSCL suction and discharge pipework;
  • Internal fitout of pump room with pumps, MSCL fittings, actuated valves and NRV’s.