YVW – Epping North Pipelines - Package 3 & 4

image2Construction of recycled and potable water mains along Harvest Home Rd, Bindts Rd and Pipe track within the Epping North area to supply growth corridor to the north of Melbourne. Works consisted of:

  • Construction of approximately 1360m of 660OD MSCL, 3098m of 419OD MSCL and 575m of 337OD MSCL recyled water main
  • Construction of approximately 1150m of 337OD potable water main.
  • Construction of dual width trenches
  • Construction of by pass pipework arrangements
  • Installation of in line valves, air valves and surface fittings
  • Testing and connection to existing system